FOLKART COUNTRY URLA PROJECT
FOLKART - URLA BADEMLER PROJESİ
- Atıksu Şebekesi Projesi,
- Yağmursuyu Şebekesi Projesi,
- Temel Drenaj Projeleri,
- Yol Projeleri,
- Tüm Saha Kazı/Dolgu Analiz ve Raporları,
- Tüm Saha Altyapı Superpoze Projesi,
REGNUM ANKARA GOLF COUNTRY PROJECT
İSTANBUL NEW AIRPORT
NEW AVIATION CENTER OF THE WORLD - İSTANBUL NEW AIRPORT
All of the sitewide infrastructures of the Istanbul New Airport project, which will be one of the biggest airports in the world built on the Istanbul European side, have been successfully completed in the another company (as the sta of the relevant company). We are proud of this service that we have done to our country and Turkish aviation engineering.
Expropriation area : 7.700 Ha
Passenger capacity for phase 1 : 90.000.000 passenger/year
Passenger capacity for final phase : 200.000.000 passenger/year
İstanbul New Airport (INA), Sitewide Utilities Planning & Design Completed work within the scope of the project;
- Sitewide wasterwater network projects,
- Sitewide stormwater network projects,
- Surface and foundation drainage projects,
- Potable water network and civil works projects,
- Fire hydrant network civil works projects,
- Service and security roads projects (including with all of engineering structures),
- Solid waste strategy and management,
- All of ancillary buildings’ infrastructure projects and coordination,
- Coordination of all sitewide infrastructure projects (superimposed projects).